Your business name
Quotation
Valid 15 days
Prepared for
Customer name
Electrical Works — Supply, Installation, Testing and Commissioning
| Item | Qty | Rate | Amount |
|---|---|---|---|
| Main distribution board with MCBs and RCCB[12-way] TPN, [IP43] enclosure | 1 nos | ₹28,500 | |
| Sub-distribution boards[8-way] SPN with MCBs | 2 nos | ₹15,600 | |
| Light point wiring (concealed, FRLS copper) | 40 point | ₹38,000 | |
| Power point wiring, 6/16 A with modular switch-socket | 36 point | ₹52,200 | |
| AC point wiring with 20 A DP switch | 8 point | ₹23,200 | |
| Chemical earthing with pit and strip | 2 set | ₹19,000 | |
| Testing, commissioning and handover documents | 1 job | ₹8,000 |
- Subtotal
- ₹1,84,500
- CGST 9%
- ₹16,605
- SGST 9%
- ₹16,605
- Total
- ₹2,17,710
Optional: LED panel light fittings ([36 W], [2x2 ft]) — ₹77,880 incl. tax, not in total.
Executive summary
This quotation covers the complete internal electrical works for [customer premises] measuring approximately [2,400 sq ft], including distribution, wiring, points and testing, executed as per IS 732 and the local electricity board's requirements.
Scope of work
- Site measurement, load calculation and layout marking - Supply and installation of main distribution board and sub-boards with MCB/RCCB protection - Concealed conduit wiring with FRLS copper cables - Light, fan, power and AC points as per the schedule of quantities - Earthing with chemical earth pit and continuity testing - Insulation resistance and polarity testing, handover of test report
Assumptions
- Civil work such as chasing and making good is in the customer's scope unless listed - Electricity board connection and meter are available at site - Working hours [9 am to 6 pm], six days a week - Drawings or layout approved by the customer before work starts
Exclusions
- DISCOM liaison, load enhancement and statutory fees - Decorative light fittings and fans (quoted on request) - Data, CCTV and fire-alarm cabling - Any work not listed in the scope
Delivery schedule
- Day 1–2: Marking and conduit laying - Day 3–8: Wiring, board fabrication and fixing - Day 9–12: Fixtures, points and earthing - Day 13–14: Testing, snag list and handover Schedule starts from receipt of advance and site readiness.
Warranty
- Workmanship: [12 months] from handover - Materials: as per manufacturer warranty, passed through to the customer